Westerly WWTP, MA - Phosphorus Removal
Blue PRO
® was chosen for the
Westerly Wastewater Treatment Facility in Marlborough, Massachusetts after a
competitive pilot project with two other technologies. The Blue PRO
®
tertiary reactive filtration system consists of continuous backwash, upflow filters
with
hydrous ferric oxide (HFO) coated media for
adsorption of phosphorus. The Blue PRO
® system was selected for the
project based on ease of operation, phosphorus results, capital affordability, and
minimized O&M expense. The Westerly facility needs to meet a mass-based permit
of 0.07 mg/L total phosphorus, and may need to achieve lower concentrations in the
future.
An extensive 30-day system performance test was completed in February, 2012. During
this test period with the plant operating within Blue Water’s design, residual
total phosphorus in 24-hour composite samples averaged 0.044 mg/L. Single samples
measured as low as 0.026 mg/L. Ortho phosphorus was never measured above 0.007
mg/L for the entire performance test.

Blue PRO
® incorporates modular and fully accessible filtration cells